Track sweets. Understand cravings.
Build better habits.
Quit Sweet helps you record sweets, respond to cravings, stay aware of your patterns, and see your progress without judgment.
- No account required
- Private on-device tracking
- Built for Android



Why it helps
More than a counter
Counting sweets on its own rarely changes anything. Quit Sweet is built to help you notice the pattern around the habit.
What you ate
Log a sweet by category and serving size. Sugar grams and cost are optional, so a quick entry stays quick.
When cravings happen
Craving logs are grouped by time of day, so a late-night or after-meal pattern becomes visible instead of assumed.
What tends to set them off
Tag a craving with a trigger such as stress, boredom or seeing sweets, and review which situations recur.
How it changes over time
Streaks, weekly totals and a four-week trend show the direction of travel, not just today.
Features
Everything you need, nothing you don't
Six tools that cover the whole loop: logging what happened, getting through a craving, and seeing what changed.
Log sweets in a few taps
Pick a category, check the prefilled amount and time, and save. Extra detail stays optional.
Three goal modes
Quit sweets, reduce gradually, or stay within a daily limit. You can change your mind later.
Support when a craving hits
A five-step pause: rate it, breathe, delay the decision, choose an action, record what happened.
Daily check-ins
A short daily reflection on mood, energy and how noticeable cravings felt.
Progress you can actually read
Streaks, weekly counts, a four-week trend, a goal calendar and craving time-of-day patterns.
Private by design
Your tracking information stays on your device. No account, and it works offline.
Inside the app
Real screens, not mockups
Every image on this site is a genuine capture from Quit Sweet running on Android.

Home screen, Reduce gradually mode 
Log a sweet in a few taps 
Craving help, step one: rate the craving 
Progress summary 
Home screen, Quit sweets mode in dark theme 
Weekly count and four-week trend
How it works
Four steps, then a short daily rhythm
Setup takes a few minutes. After that it is a few taps a day, only when you need it.
Choose your goal
Quit sweets, reduce gradually, or stay within a daily limit. You can change this later without losing history.
Record sweets and cravings
Log a sweet in a few taps. Note a craving even when you decide not to eat anything, because that is useful data too.
Check in with yourself
A short daily reflection on mood, energy and how strong cravings felt. One check-in per day, editable any time.
Review patterns and progress
See streaks, weekly totals, craving times and a goal calendar built from what you actually recorded.
Craving support
Create a pause before the decision
When a craving hits, Quit Sweet offers a short, optional flow that puts a few moments between the urge and the choice.
Rate the craving
Choose how strong it feels, from very light to very strong. You can optionally note what prompted it: stress, boredom, after meals, late night and more. There is no wrong answer.
Pause and breathe
A short guided breathing pause with inhale, hold and exhale phases, and an optional tap when the phase changes. It is a short pause, not treatment, and you can skip it whenever you want.
Delay the decision
Give yourself three, five or ten minutes before deciding. A short delay can create space to choose. You can finish early at any time.
Choose another action
Pick one small thing that feels manageable right now: drink water, take a short walk, change your location, message someone, keep breathing, or add your own action.
Record what happened
Note whether the craving passed, whether you ate something sweet, or that you are not sure yet. Every option keeps your existing history.
Cravings feel different for everyone. This is a motivational pause-and-reflect tool, not medical treatment. The breathing exercise and delay are optional.
How craving support works

Progress
See what actually changed
Review your saved entries through streaks, charts and patterns calculated on your device. Baseline-based estimates are labelled, and days without records remain untracked in the calendar.
Streaks and on-goal days
Current streak, best streak, and how many days met your goal, all recalculated from your saved entries.
Weekly and four-week views
A bar chart for the last seven days against your target, plus four consecutive weekly totals.
Craving patterns
Cravings grouped into morning, afternoon, evening and night, so the timing becomes obvious.
Achievements and check-ins
Twelve milestones based on your own activity, and a searchable history of every check-in.
Sweets avoided and money saved are shown as estimates. Both are calculated from the baseline and spending figures you enter yourself, so they are only as accurate as those numbers.

Progress summary 
Weekly count and four-week trend 
Goal calendar 
Achievements and milestones
Your habit data stays with you
Quit Sweet does not require an account. Your sweet logs, craving records, check-ins and goals are stored locally on your device.
No account required
There is no sign-up or online account. Set up your goal on your device and start tracking.
No advertising tracker
The app carries no advertising SDK and no analytics SDK, and this website sets no cookies.
Export or delete your information
You can export your records or delete everything from inside the app, whenever you want.

Questions
Common questions
Short, direct answers. The full list covers privacy, goals, reminders and data.
What is Quit Sweet?
Quit Sweet is an Android habit-tracking and motivational app for people who want to cut back on sweets. It lets you log the sweets you eat, understand what triggers your cravings, build streaks toward a goal you choose, use a short craving-support flow when a craving hits, record daily check-ins, and review your progress over time.
How much does Quit Sweet cost?
Quit Sweet is free to download from Google Play. The store listing is the authoritative source, so check it there if you want to be certain.
Do I need to count calories or sugar grams?
No. Quit Sweet is built around counting how often you eat sweets, not nutrition data. Sugar grams and cost are optional fields you can leave blank on every entry, and onboarding states plainly that you will not need to enter sugar grams.
Does Quit Sweet give medical advice?
No. Quit Sweet is a habit-tracking and motivational tool. It does not provide medical advice, diagnosis or treatment, and it does not claim to treat any condition. If you have health concerns about your diet, please speak with a qualified healthcare professional.
Where is my tracking data stored?
Your tracking information is stored locally on your device, with no account or cloud sync. Exporting a copy or submitting a Help & Support message are separate actions that you choose to take.
Do I need to create an account?
No. There is no sign-up, login or account of any kind. You can start using the app immediately after setup.
Start building a more intentional routine
Set a goal that suits you, track what actually happens, and let the patterns speak for themselves.
- An account is not required.
- Your habit data stays on your device.
- The app works offline.
Quit Sweet: Sugar Tracker · Available for Android